    The best log home foundation

    I loved my father.
    I hated my father.

    To this day, I'm still learning lessons from him.
    You can try it along with me.

    His favorite foundation style was Pier Blocks.
    It was the only one he taught.

    Now try to decipher all the lessons in that.

  2. #2
    LHBA Member Shark's Avatar
    Join Date
    Feb 2006
    Location
    Hauser, ID
    Posts
    5,411
    They have their place....

    But then you have to close everything in.....

    First time we did modified piers (Sono tubes).

    Second time we did ICF.

    I would only do ICF again.

    jandjloghome.blogspot.com
    Completed #1 - Sold #1.....#2 about to start
    http://jandjloghome.blogspot.com/

  3. #3
    LHBA Member rckclmbr428's Avatar
    Join Date
    Aug 2007
    Location
    Roanoke, VA
    Posts
    4,130
    After building a hundred or so I refuse to use pier blocks.
    www.WileyLogHomes.com
    "Hand Crafted Traditions"

  4. #4
    Administrator Ellsworth's Avatar
    Join Date
    Jan 2005
    Posts
    3,575
    Blog Entries
    54
    1) If as an owner builder you have to subcontract your foundation, consider another course.
    Because next you might be tempted to subcontract your walls.

    [That's not intended as a slight toward Ronnie Rock Climber]

  5. #5
    Administrator Ellsworth's Avatar
    Join Date
    Jan 2005
    Posts
    3,575
    Blog Entries
    54
    2) LHBA Pier blocks are extremely hard to subcontract out, and have them done properly and on time (under budget).
    If that gives you problems, then perhaps consider that it's not to late to sell the property with half a foundation on it.

  6. #6
    Administrator Ellsworth's Avatar
    Join Date
    Jan 2005
    Posts
    3,575
    Blog Entries
    54
    3) As an owner builder concerned with finances: using pier blocks rather than a stemwall + footer will typically enable you to skip:
    A) water proofing B) venting C) drainage system D) most of the rebar that would be used for a stemwall foundation E) most of the sill material (PT wood and water barrier)

    The vapor barrier that would have been used inside a crawl space is not skipped.
    If you're not excited to try something new (or at least seriously consider it) to save money and labor, then perhaps this LHBA system is not right for you?
    Last edited by Ellsworth; 08-12-2024 at 06:16 AM. Reason: No warm up, 3 edits

  7. #7
    Administrator Ellsworth's Avatar
    Join Date
    Jan 2005
    Posts
    3,575
    Blog Entries
    54
    4)

    A) Submit your log home plans, with a pier block foundation, to your jurisdiction.

    B) If they reject the plan because of the pier blocks, then you are building in the WRONG location.

    C) If they approve pier blocks, then you might be building in the RIGHT location.

    D) Do step A to see if it leads to B or C, even if you want to build with a stem-wall. You will still learn if you are building in the right location.
    If they approve pier blocks, then march in the next day with the stem-wall plan and another check, because you picked the right location.

    __________________________________________________ ______________________________
    Caveat, as with most things in life, a positive attitude will get you further with the planning department than anything except... wealth or political connections!
    (Thanks election year, for all the material!)

    D is not totally a joke, just sort of. I'd suggest that you don't make them feel tricked, but perhaps start a conversation using pier blocks to explore their willingness to work with the unorthodox, gauge the resistance. It could matter when it comes to later inspections of your log structure.
    Last edited by Ellsworth; 08-12-2024 at 06:08 AM. Reason: No warm up, 4 edit

  8. #8
    Administrator Ellsworth's Avatar
    Join Date
    Jan 2005
    Posts
    3,575
    Blog Entries
    54
    5) You can build the forms in the city, in your driveway, and stack them up to save space.

    Trailer them to your build site on a Friday, and if the holes are pre-dug then by Monday you might be ready for the pour.

    If a continuous footer is required under the piers in your jurisdiction, add some dig time (yuck).
    Last edited by Ellsworth; 08-12-2024 at 06:15 AM. Reason: No warm up, 1 edit

  9. #9
    Administrator Ellsworth's Avatar
    Join Date
    Jan 2005
    Posts
    3,575
    Blog Entries
    54
    6) The amount of rebar and plywood required for an LHBA pier block system can be scavenged for free in most localities. Regardless of the size home you're building.

  10. #10
    Administrator Ellsworth's Avatar
    Join Date
    Jan 2005
    Posts
    3,575
    Blog Entries
    54
    7) You can screw up your pier foundation in a lot of ways, and it generally still works out fine.
    For instance, if the elevations differ a bit between piers, just use a thicker sill pate or notch the log wall (depending on which way you need to compensate).

  11. #11
    Administrator Ellsworth's Avatar
    Join Date
    Jan 2005
    Posts
    3,575
    Blog Entries
    54
    8) If your local inspector sees you do something novel, and do it well, then the rest of your build should go even better.
    If you screw up your relationship with your local inspector over your pier block foundation, it's not too late to sell property with a foundation on it
    (This is half a joke, half reality and some actual psychology. The novel done well always impresses).
    Last edited by Ellsworth; 08-12-2024 at 07:40 AM. Reason: No warm up, 3 edit

  12. #12
    Administrator Ellsworth's Avatar
    Join Date
    Jan 2005
    Posts
    3,575
    Blog Entries
    54
    9) We had a member in WA, one of the Pauls, who built for approx 15 or 20 years. It was his retirement hobby, up in the mountains.
    He's the guy who built a log boom crane.

    He reminds me that some build slow by choice or necessity.

    With piers, a fellow could drive up on a Friday with bags of concrete mix. Spend the weekend mixing and pouring on site and over two days he might have finished three to five piers.

  13. #13
    Administrator Ellsworth's Avatar
    Join Date
    Jan 2005
    Posts
    3,575
    Blog Entries
    54
    10) Making the pier block forms is the second hardest mathematical task of a build (stairs being the first!).

    If you can't do the math, or develop a hack, then perhaps your first course of logs should be cedar.
    Laid upon the ground!

    (Sure, this one is half a joke.)

  14. #14
    Administrator Ellsworth's Avatar
    Join Date
    Jan 2005
    Posts
    3,575
    Blog Entries
    54
    11) Buy your raw land cheap enough so you can break even, if you need to walk away during or right after the foundation phase.
    It might not be the ideal location, if you can't do that.

    Edited to add:
    Opps, this isn't pier specific.
    Last edited by Ellsworth; 08-12-2024 at 08:37 AM. Reason: No warm up, 1 edit

  15. #15
    Administrator Ellsworth's Avatar
    Join Date
    Jan 2005
    Posts
    3,575
    Blog Entries
    54
    To be clear, I'm imaging most of these lessons. A few were articulated by Skip.
    AFAIK, Skip mostly liked piers because the only decent alternative at the time was a traditional stemwall / footer.
    Using pier blocks saved time and money.

    One reason we moved away from piers was because a few jurisdictions (in CA, OR and WA) started requiring a continuous footer under the piers.
    Once you have to do all the excavation, then other options jumped into the hole.

    AFAIK, the only reason some jurisdictions require the footer is so the piers might move in unison during an earthquake.
    If the goal is to hold them in place, in relationship to each other while under seismic loading, then it shouldn't matter if that's done at the top or the bottom of the piers.
    With that constraint, perhaps engineering solutions exist that are cheaper and easier than a traditional footer.

    So my question is this, why not use the wall logs as the 'footers' for a pier block foundation?

    There should be three or more different ways to accomplish that goal.
    It might require some metal components, like brackets, flat iron, et cetera (likely not).
    It might require replacing the rebar that holds the piers to the logs with grade 8 or grade 9 all-thread (approx 25% price difference between rod grades).
    It might require two or three all-thread in each pier.
    It might require square or round piers.

    Edited to add:
    The potential 'hinged movement' that is perpendicular to the log wall could be controlled by adding log beams (approx five to six additional logs on a small cabin build).

    Beams on the interior of structure, stretching from exterior wall to exterior wall, resting atop opposite pier blocks and affixed at both ends with all-thread and rebar.

    Edited to add:
    It might be a simpler system to run a standard log first course, and then adjacent to that run a course of milled 10x12s.

    The milled beams are full length, bolted to the foundation and side spiked (or through bolted) to the adjacent first layer of wall logs.
    The milled beams become the over sized ledger board for the floor joists.

    That double first layer, and multiple pier attachment points, might be enough to prevent hinged movement in all 4 directions.

    Preliminary ideas are over, they might fly as well as a log off a low hill, this will take an engineer.
    Last edited by Ellsworth; 08-16-2024 at 06:21 PM. Reason: No warm up, 26 edits

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •