the tele arrived yesterday. we have it for a month here's the plan -finish chinking the 15 rows we have left on the outside -OSB, tyvek, siding on both the north and the south shed dormer -finish framing east and west gable ends (west is almost completed) -OSB, tyvek, windows doors, side both gable ends we have 5 weeks to do it here's to dry days!
we're half way through the 2016 building season. the grass seed we spread is growing well we've been working on finishing chinking; have 23 rows left to chink we have 3/4 of the loft floor joists up; we hope to finish next week we intend to rent a tele for the month of August to frame side the dormer and gable ends and install all windows and doors on the top floor and also cut out, buck and install all the rest of the exterior windows and doors. ...
at the request of a fellow LHBA-er, I'm summarizing the garage build site clearing volunteer log peelers garage frost wall more garage logs ...
We are in the EARLY stages, have no logs yet, nor running water or electricity, but it will happen, and I am excited for all of the fun getting there. I love everyone's stories that I read on here. Others like to know what we are doing with this interesting adventure. If you would please check out my blog, I would really appreciate it. http://www.therearecowsinthekitchen.com/ Thanks so much! Seriously! Michelle D
Here's the latest post from my blog: https://loghomejourney.wordpress.com...-home-builder/ the password is still ABCD1234