kevinbarr
09-02-2005, 10:19 PM
I am new to this forum, so please bear with me. I am in the process of getting a cost estimate for doing a log cabin build.
I recived a quote from a contractor to build a Strongwood (manufacture) log cabin for me. The finshed square footage was approximatley 1300.
The price he quoted me was $150.00/Finshed square foot. This price includes the site prep, road, walkout basement, setting logs, all framing, roof, decks, electrical rough in, plumbing rough in, all HVAC installed and final grade.
I have alwasy heard of estimates of $100-$150 per square foot for "Turn Key" homes (ready to move in), but I am paying that for what i would call a dry in. Am I off base? The cabin will be located in Wisconsin.
The contractor has been totally open with me and supplied me with all bids. The contractors bids totaled approx 122K, then he added 60k for his labor in setting logs, framing, roofing the cabin, installing widows ect.
Is that way off base or not
SORRY SO LONG WINDED
Kevin
I recived a quote from a contractor to build a Strongwood (manufacture) log cabin for me. The finshed square footage was approximatley 1300.
The price he quoted me was $150.00/Finshed square foot. This price includes the site prep, road, walkout basement, setting logs, all framing, roof, decks, electrical rough in, plumbing rough in, all HVAC installed and final grade.
I have alwasy heard of estimates of $100-$150 per square foot for "Turn Key" homes (ready to move in), but I am paying that for what i would call a dry in. Am I off base? The cabin will be located in Wisconsin.
The contractor has been totally open with me and supplied me with all bids. The contractors bids totaled approx 122K, then he added 60k for his labor in setting logs, framing, roofing the cabin, installing widows ect.
Is that way off base or not
SORRY SO LONG WINDED
Kevin