6 trips for 120 -12" logs sounds a bought right. My logs were mostly 10 and 11's and I got 25 logs on each truck. I also paid $300 buck to haul them approx. 50 miles.
Read up an Scribner method of getting board feet from logs. If I remember correctly, a 12 inch top, 40 feet long will yield 200 board feet. At $925 per (thousand), I paid $216. If I built my home with 12" tops I would have used 52 logs or $11,232.
My log stack had 54 wall logs, 2 cap logs, 1 ridge pole and 3 girder logs or 60 logs. If I were building with 12" logs the number would have been 46 +2 + 1 + 3 = 52.
Bookmarks