we've been going back up the build for a few weeks now.
working on closing in the triangle sides of the shed dormers, then will get the metal roof on.
the roof looks great after spending 6 months covered with titanium. so glad we were able to get that step done before snow fall!
after the dormer triangles and metal roof we hope to
-pour cement floor in basement (with PEX for in floor heat!)
-do final grade
-build main floor and loft decks
-sand blast, final borate (love the sound of that!!), stain logs
-chinking insulation, chinking nails, chink exterior and interior
-frame in and close up gable ends
-cut, frame and install windows
-cut, frame and install doors
if we can manage all that, we'll be able to heat it over the winter and continue moving forward in the cold months.
we'll see how it goes
Happy building